Overhead line vegetation clearing and substation compound grass cutting
Long term Areement for 1st extension of contract for overhead line vegetation clearing and substation compound grass cutting in Asajaya, Western Region
Client: Sarawak Energy
Duration: 16.06.2019 to 15.06.2020
Overhead lines vegetation clearing
Tender for overhead lines vegetation clearing in the Petra Jaya, Western Region
Client: Sarawak Energy
Duration: 01.05.2019 to 30.04.2020
33kV O.H. Line extension
Tender for 33kV O.H. Line extension from Sundar Junction to Sundar Bazaar
Client: Sarawak Energy
Duration: 01.05.2019 to 31.12.2019
33kV O.H. Line extension
Tender for 33kV O.H. Line extension from Sundar Junction to Trusan Bazaar
Client: Sarawak Energy
Duration: 01.05.2019 to 31.12.2019
24 Hour Standby Services
4 months extension – 24 Hour Standby Services Lawas Northern Region
Client: Sarawak Energy
Duration: 01.01.2018 to 30.04.2018
Construction and maintenance of distribution systems
2nd and final extension of Contract for Construction and maintenance of distribution system Lawas Northern Region
Client: Sarawak Energy
Duration: 01.11.2017 to 31.10.2018
Power Relocation Works for The Development and Upgrading of the Pan Borneo Highway
Power Relocation Works for The Development and Upgrading of the Proposed Pan Borneo Highway in The State Sarawak . (Section 1b – Betong Section –Batang Skrang Bridge to Spaoh Bridge)
Client: Shorefield Sdn Bhd
Duration: 29.05.2017 To 29.05.2019
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
2nd & Final Extension of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Asajaya, Western Region (GOMTC 133/2017)
Client: Sarawak Energy
Duration: 16.06.17 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Lundu, Western Region (GOMTC 507/2016)
Client: Sarawak Energy
Duration: 01.03.17 (One year)
Overhead Lines Vegetation Clearing and Substation Compound Grass Cutting
Overhead Lines Vegetation Clearing and Substation Compound Grass Cutting in Serian and Siburan, Western Region (OMTC 335/2016)
Client: Sarawak Energy
Duration: 01.03.17 (One year)
Overhead Lines Vegetation Clearing
1st Extension of Contract for Overhead Lines Vegetation Clearing in Petra Jaya, Western Region (OMTC 354/2016)
Client: Sarawak Energy
Duration: 01.01.2017 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
2nd Extension Of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Bau, Western Region (OMTC 376/2016)
Client: Sarawak Energy
Duration: 24.10.2016 (One Year)
Overhad Line Vegetation Clearing and Substation Compound Grass Cutting
Overhad Line Vegetation Clearing and Substation Compound Grass Cutting in Betong (OMTC207/2016)
Client: Sarawak Energy
Duration: 17.06.2016 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
1st Extension Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Asajaya, Western Region (OMTC205/2016)
Client: Sarawak Energy
Duration: 16.06.2016 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Betong, Western Region (OMTC 207/2016)
Client: Sarawak Energy
Duration: 17.06.2016 (One Year)
Construction and Maintenance of Distribution Systems
Construction and Maintenance of Distribution System in Lawas, Northern Region (OMTC Paper No. 89/2016)
Client: Sarawak Energy
Duration: 11.03.2016 (One Year)
Overhead Lines Vegetation Clearing
Tender For Overhead Lines Vegetation Clearing in Petra Jaya, Western Region (OMTC Paper No. 467/2015)
Client: Sarawak Energy
Duration: 01.01.2016 (One Year)
24 Hours Standby Services
1st Extension of Contract for 24 Hours Standby Services in Lawas, Northern Region (OMTC 469/2015)
Client: Sarawak Energy
Duration: 01.01.2016 (One Year)
Replacement and Reinforcement of Earthing
Replacement and Reinforcement of Earthing at Various substation in Sibu (Central Region) (RTC Paper No. 2/2015)
Client: Sarawak Energy
Duration: 16.03.2015 (One Year)
Construction and Maintenance of Distribution System
Second Extension of Contract for Construction and Maintenance of Distribution System in Lawas, Northern Region (OMTC Paper No. 97/2015)
Client: Sarawak Energy
Duration: 11.03.2015 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
First Extension of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Siburan and Serian, Western Region (OMTC paper No. 62/2015)
Client: Sarawak Energy
Duration: 01.03.2015 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
1st Extension of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Lundu, Western Region (OMTC 22/2015)
Client: Sarawak Energy
Duration: 01.03.2015 (One Year)
Transferring of 33KV Outdoor Switchgear from Housing Substation
Tender For the Transferring of 33KV Outdoor Switchgear from Housing Substation and other related works in Bintulu, Northern Region
Client: Sarawak Energy
Duration: 03.02.2015 (One Year)
Maintenance of Main and Sub Mains Wiring
Maintenance of Main and Sub Mains Wiring For Limbang & Lawas (RTC No: 50(A)/2014)
Client: Sarawak Energy
Duration: 08.01.2015 (One Year)
Electrical works for Pemohon-Pemohon
Electrical works for Pemohon-Pemohon di Kpg penasu, Penasu. (RE1/2013/DAR/N37/37/WP2)
Client: Shorefield Sdn Bhd
Duration: 23.01.2015 (243 days)
24 Hours Standby Services
24 Hours Standby Services in Lawas, Northern Region (Contract Approved Under OMTC Paper No. 489/2014)
Client: Sarawak Energy
Duration: 01.01.2015 (One Year)
Overhead Lines Vegetation Clearing
Second Extention of Contract For Overhead Lines Vegetation Clearing in Petra Jaya, Western Region (OMTC Paper No. 372/2014)
Client: Sarawak Energy
Duration: 01.01.2015 (One Year)
Menghantar Kelengkapan Makmal, Jabatan kejuruteraan Elektrikal dan Elektronik, Fakulti Kejuruteraan
Membekal dan Menghantar Kelengkapan Makmal, Jabatan kejuruteraan Elektrikal dan Elektronik, Fakulti Kejuruteraan, Universiti Malaysia Sarawak, 94300 Kota Samarahan, Sarawak (Solar Equipment) (No. Pesanan Rasmi : 0000024674)
Client: Universiti Malaysia Sarawak
Duration: 03.05.2015 (8 Weeks)
Supply Installation, Testing and Commissioning of Solar Street Lighting and Solar Compound Lighting
Term Contract For Supply Installation, Testing and Commissioning of Solar Street Lighting and Solar Compound Lighting at Areas Under Jurisdiction of Samarahan District Council For The Year 2015 (MDS/PW/T/29/2015)
Client: Majlis Daerah Samarahan
Duration: 01.04.2015 (9 Months)
Overhead Line Vegetation Clearing and Substation Grass Cutting
Overhead Line Vegetation Clearing and Substation Grass Cutting in Bau, Western Region (OMTC Paper No. 341/2014)
Client: Sarawak Energy
Duration: 24.10.2014 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
2nd Extension of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Simunjan and Sebuyau, Western Region (OMTC Paper No.:225/2014)
Client: Sarawak Energy
Duration: 01.08.2014 (One Year)
Overhead Clearing and Substation Compound Grass Cutting
2nd Extension of Contract For Overhead Clearing and Substation Compound Grass Cutting in Asajaya, Western Region (OMTC Paper No: 151/2014)
Client: Sarawak Energy
Duration: 16.06.2014 (One year)
Electrical Works For VT/VR
Electrical Works For VT/VR untuk pemohon-pemohon di Rh. Empenit Bungkang, Padeh (RE1/2013/BET/N31/14/WP2)
Client: Shorefield Sdn Bhd
Duration: 16.10.2013 (90 days)
Units EPE 12kV VCB & One (1) Unit EPE Bus VT Enclosure for Various Substations
Contract For Supply, Installation and Commissioning of Four (4) Units EPE 12kV VCB & One (1) Unit EPE Bus VT Enclosure for Various Substations, Sibu (RTC 68/2013)
Client: Sarawak Energy
Duration: 15.01.2014 (One Year)
Overhead Line Vegetation Clearing
First Extension of Contract for Overhead Line Vegetation Clearing in Petra Jaya, Western Region (OMTC Paper No. 332/2013)
Client: Sarawak Energy
Duration: 01.01.2014 (One Year)
Supply, Delivery, Installation, Testing and Commissioning of Solar Home System
Supply, Delivery, Installation, Testing and Commissioning of Solar Home System For Rumah Kino and Rumah Manggat in Batang Ai, Sri Aman, Sarawak.
Client: Sarawak Energy
Duration: 04.11.2014 (Two and Half Months)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
OMTC Paper No. 341/2014 Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Bau, Western Region
Client: Sarawak Energy
Duration: 24.10.2014 (One Year)
24 Hours Standby Services and Street Lighting Maintenance
OMTC Paper No. 222/2014 4-Month Extension 24 Hours Standby Services and Street Lighting Maintenance In Lawas, Northern Region
Client: Sarawak Energy
Duration: 01.09.2014 (4Month)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
OMTC Paper No. 225/2014 2nd Extension Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Simunjan and Sebuyau, Western Region
Client: Sarawak Energy
Duration: 01.08.2014 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
OMTC Paper No. 151/2014 2nd Extension Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Asajaya, Western Region
Client: Sarawak Energy
Duration: 16.06.2014 (One Year)
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
OMTC Paper No. 57/2014 Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Siburan and Serian, Western Region.
Client: Sarawak Energy
Duration: 01.03.2014 to 28.02.2015
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
OMTC Paper No. 029/2014 Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Lundu, Western Region.
Client: Sarawak Energy
Duration: 01.03.2014 To 28.02.2015
Supply, Delivery, Installation and Commissioning of Four(4) Units EPE 12kV VCB & One (1) Unit EPE Bus VT Enclosure
RTC Paper No.: 68/2013 The Supply, Delivery, Installation and Commissioning of Four(4) Units EPE 12kV VCB & One (1) Unit EPE Bus VT Enclosure for Various Substations, Sibu
Client: Sarawak Energy
Duration: 15.01.2014 to 14.01.2015
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
MTC Paper No. 500/2012 2nd Extension of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Serian and Siburan, Western Region.
Client: Sarawak Energy
Duration: 01.03.2013 to 28.02.2014
Overhead Line Vegetation Cleaning and Substation Compound Grass Cutting
MTC Paper No.99/2013) 2nd Extension of Contract for Overhead Line Vegetation Cleaning and Substation Compound Grass Cutting in Serian and Siburan, Western Region.
Client: Sarawak Energy
Duration: 01.03.2013 to 28.02.2014
Overhead Line Vegetation Clearing
OMTC Paper No. 332/2013 First Extension of Contract for Overhead Line Vegetation Clearing in Petra Jaya, Western Region
Client: Sarawak Energy
Duration: 01.01.2014 to 31.12.2014
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
OMTC Paper No. 242/2013 2nd Extention of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Curring in Bau, Western Region
Client: Sarawak Energy
Duration: 24.10.2013 to 23.10.2014
Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
MTC Paper No. 442/2012 1st Extension of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting in Bau, Western Region.
Client: Sarawak Energy
Duration: 24.10.2012 to 23.10.2013
Electrical Works for VT/VR untuk Pemohon-Pemohon
Electrical Works for VT/VR untuk Pemohon-Pemohon di Rh Empenit Bungkang, Padeh (RE1/2013/BET/N31/14/WP2)
Client: KKLW (Shorefield Sdn Bhd)
Duration: 16.10.2013
Electrical Works For VT/VR untuk Pemohon-Pemohon
RE11/2012/N38/MATU/47/WP2A Electrical Works For VT/VR untuk Pemohon-Pemohon di Mering, Rh Lebong, Kpg Kebuaw, SK Kebuaw, Batang Igan, Kut Muara-Dalat.
Client: KKLW (Shorefield Sdn Bhd)
Duration: 06.05.2013 to 06.10.2013
Supply, Delivery Installation and Commissioning of Two (2) Units TAMCO 12kV 630A 250kA/3sec VCB Panel C/W
RTC Paper No. 49/2013 Contract for the Supply, Delivery Installation and Commissioning of Two (2) Units TAMCO 12kV 630A 250kA/3sec VCB Panel C/W Associated Ancillary Equipment at New Sungai Merah 33/11kV Substation, Sibu.
Client: Sarawak Energy
Duration: 01.10.2013 to 30.09.2014
Extension for 24 Hours Standby Services and Street Lighting Maintenance
OMTC Paper No. 68/2013 First Extension of Contract for 24 Hours Standby Services and Street Lighting Maintenance In Lawas, Northern Region
Client: Sarawak Energy
Duration: 01.09.2013 to 31.08.2014
Supply, Delivery Installation & Commissioning of 110V DC Batteries
RTC Paper No.:38/2013 Tender for Supply, Delivery Installation & Commissioning of 110V DC Batteries for New Sg. Merah 33/11kV Substation & Bandong 33/11kV Substation in Sibu (Central Region)
Client: Sarawak Energy
Duration: 29.08.2013 to 28.08.2014
Construction & Maintenance of Distribution System
MTC Paper No. 93/2013 Construction & Maintenance of Distribution System in Lawas, Northern Region
Client: Sarawak Energy
Duration: 11.03.2013 to 10.03.2014
Extension of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Cutting
MTC Paper No. 99/2013 2nd Extension of Contract for Overhead Line Vegetation Clearing and Substation Compound Grass Curring in Lundu, Western Region
Client: Sarawak Energy
Duration: 01.03.2013 to 28.02.2014
Electrical Works For VR untuk Pemohon-Pemohon Tambahan
Electrical Works For VR untuk Pemohon-Pemohon Tambahan di KG Tg Assam (RE11/2012/N30/BET/17/WP2)
Client: KKLW (Shorefield Sdn Bhd)
Duration: 17.12.2012
Electrical works for VT/VR untuk Pemohon-Pemohon Tambahan
Electrical works for VT/VR untuk Pemohon-Pemohon Tambahan Kpg. Supa, Betong (RE11/2012/N30/BET/14/WP2)
Client: KKLW (Shorefield Sdn Bhd)
Duration: 17.12.2012
Electrical works for VR untuk Pemohon-Pemohon tambahan
Electrical works for VR untuk Pemohon-Pemohon tambahan di Kg Balingan, Betong (RE11/2012/N30/BET/16/WP2)
Client: KKLW (Shorefield Sdn Bhd)
Duration: 17.12.2012
24 Hours Standby Service and Street Lighting Maintenance
MTC Paper No. 372/2012 24 Hours Standby Service and Street Lighting Maintenance In Lawas, Northern Region.
Client: Sarawak Energy
Duration: 01.09.2012 to 31.08.2013
Overhead Line Vegetation Clearing And Substation Compound Grass Cutting
MTC Paper No. 274/2012 Overhead Line Vegetation Clearing And Substation Compound Grass Cutting In Simunjan And Sebuyau, Western Region.
Client: Sarawak Energy
Duration: 01.08.2012 to 31.07.2013
Overhead Line Vegetation Clearing And Substation Compound Grass Cutting
MTC Paper No. 227/2012 Overhead Line Vegetation Clearing And Substation Compound Grass Cutting In Asajaya, Western Region.
Client: Sarawak Energy
Duration: 16.06.2012 to 15.06.2013
Major and Minor Substation Routine Maintenance
MTC Paper No. 95/2011 Extension of Contract for Major and Minor Substation Routine Maintenance in Kuching, Western region on Month Basis up to 4 months.
Client: Sarawak Energy
Duration: 01.04.2012 to 31.07.2012
Overhead Line Vegetation Clearing & Substation Compound Grass Cutting
MTC Paper No. 455/2011 1st Extension of Contract for Overhead Line Vegetation Clearing & Substation Compound Grass Cutting In Serian & Siburan, Western Region.
Client: Sarawak Energy
Duration: 01.03.2012 to 28.02.2013
MTC Paper No. 29/2011 1st Extension of Contract for Overhead Line Vegetation Clearing & Substation Compound Grass Cutting In Lundu, Western Region.
MTC Paper No. 29/2011 1st Extension of Contract for Overhead Line Vegetation Clearing & Substation Compound Grass Cutting In Lundu, Western Region.
Client: Sarawak Energy
Duration: 01.03.2012 to 28.02.2013
33kV & 11kV Substation Routine Maintenance
RTC 55/2008 Extension of Contract for 33kV & 11kV Substation Routine Maintenance in Sarikei Station on Month to Month Basis up to 3 mouths.
Client: Sarawak Energy
Duration: 01.01.2012 to 31.03.2012
Overhead Line Vegetation Clearing & Substation Compound Grass Cutting
MTC Paper No. 461/2011 Overhead Line Vegetation Clearing & Substation Compound Grass Cutting In Bau, Western Region.
Client: Sarawak Energy
Duration: 24.10.2011 to 23.10.2012
Installation & Dismantling of Substation Equipment & Underground & Aerial Cable Jointing
MTC Paper No. 270/2011 2nd Extension of Contract for The Installation & Dismantling of Substation Equipment & Underground & Aerial Cable Jointing in Sarikei Station.
Client: Sarawak Energy
Duration: 01.09.2011 to 31.08.2012
Overhead Line Vegetation Clearing & Substation Compound Grass Cutting
MTC Paper No. 268/2011 2nd Extension of Contract For Overhead Line Vegetation Clearing & Substation Compound Grass Cutting in Simunjan & Sebuyau, Western Region
Client: Sarawak Energy
Duration: 01.08.2011 to 31.07.2012
Extension of Contract for Overhead Line Vegetation Clearing & Substation Grass Cutting
MTC Paper No.206/2011 2nd Extension of Contract for Overhead Line Vegetation Clearing & Substation Grass Cutting In Asajaya.
Client: Sarawak Energy
Duration: 16.06.2011 to 15.06.2012
Extension of Contract for underground Cable Laying & Street Lighting
GMDC Paper No. 34/2009 2nd Extension of Contract for underground Cable Laying & Street Lighting Column Erection in Kuching/Samarahan –Zone B
Client: Sarawak Energy
Duration: 01.06.2011 to 31.05.2012
Major And Manor Substations Routine Maintenance
MTC Paper No. 95/2011 Major And Manor Substations Routine Maintenance in Kuching Western Region
Client: Sarawak Energy
Duration: 01.04.2011 to 30.09.2012
Electrical Works For Pemohon-Pemohon
SUB/RE07/2010/LBK ANTU/21 Electrical Works For Pemohon-Pemohon di Rh. Karak Stengin, Rh. Ameh, Stengin & Rh. Ugin, Stenji
Client: Sarawak Energy
Duration: 01.04.2011 to 15.06.2011
Overhead Line Vegetation Clearing & Substation Compound Grass Cutting
MTC Paper No.28/2011 Overhead Line Vegetation Clearing & Substation Compound Grass Cutting In Serian & Siburan, Western Region.
Client: Sarawak Energy
Duration: 01.03.2011 to 29.02.2012
Overhead Line Vegetation Clearing & Substation Compound Grass Cutting
MTC Paper No. 92/2011 Overhead Line Vegetation Clearing & Substation Compound Grass Cutting in Lundu, Western Region
Client: Sarawak Energy
Duration: 01.03.2011 to 29.02.2012
Pole Pegging & Electrical Works
SUB/RE10-11/BET/N20/37 Pole Pegging & Electrical Works at Kawasan Sg. Pangka, Rh Maja, Sg Bunut, Rh Belang, Ensawa, Rh Chanddi, Ng Budu, Pejabat Pendaftaran Negara Ng Budu dan SK Ng Budu, Pejabat Pertanian (Pejabat Salcra) Rh Elai ak Angih & Rh Enjawan Ak Ajie Rh Jabu, Ng Senulau Budu, Rh Bunyih, Ng Senulau Budu, Rh Pantan, Ulu Senulau Budu, Rh Mujan, Ng Dong Senulau Budu, Rh Gayan, Dassey Budu, Rh Moses, Lubok Krukoh Budu, SK Ulu Budu, Pusat Komuniti St John, Lubok Krukoh Budu, Pusat Komuniti Gereja SIB, Ulu Budu, Rh Jemat, Ng Kau Budu, Rh Philip Bandang, Sg. Nyurok Budu, Rh Graman, Ulu Budu, Rh Bangsang, Sg Langgir Budu & Pusat Komuniti St John, Ng Awas Krian, Rh Anja, Rh Gumi, Engkala Krian, Rh Federick Juan, Kumpai Krian, Rh Inyang, Sg Bansu Krian, Rh Jamil, Ng Puak Krian, Rh Kayan, Ng Telik Krian, Jimmy Mawar, Sg Galah Krian, Rh Jantai, Krangan Tinggi Krian, Rh Nyueok, Ng Maras Krian, Rh Tambi, Sg Isu Krian, Rh Jantum, Ng Blangun Krian & Sk Ng Greniang, Krian. Rh Jaga, Tembawai Empran Krian, Rh Endawai, Ng Grenjang Krian, Rh Jawi, Ng Awas Krian, Rh Anja, Ulu Awas Krian, Rh Lega, Ng Entaih Krian, Rh Langan, Ulu Krian, Rh Henry Sang, Ulu Grenjang Krian, Rh Jungan, Ng Long Grenjang Krian & Rh Encharang, Ng Alum Grenjang Krian, Rh Apang, Sg Paku Krian, Rh Juli, Ng Batang Krian & Rh Minggat , Ng Batang Krian.
Client: KKLW (Shorefield Sdn Bhd)
Duration: 13.09.2010 to 12.11.2011
Extension for Overhead Line Vegetation Clearing & Substation Compound Grass Cutting
MTC Paper No. 195/2010 First Extension of Contract for Overhead Line Vegetation Clearing & Substation Compound Grass Cutting in Semunjan & Sebuyau.
Client: Sarawak Energy
Duration: 01.08.2010 to 31.07.2011
Electrical Works
SUB/RE45-09/SRI/N123/Z456/94 Electrical Works at Kpg Lingga & Kpg Upik Lingga
Client: KKLW (Shorefield Sdn Bhd)
Duration: 15.07.2010 to 30.11.2010
Electrical Works
SUB/RE45-09/SRI/N23/Z456/93 Electrical Works at Rh Jonshon Intai, Sekudu Panjai, Rh Kiang Ak Enterau, Rh Tuntun, Rh Anthony, Rh Ngindang, Rh Unok, Rh Lau, Rh Ujang Trusan, Rh Jengeing Ak Salang & Rhm Individu, Jln Lingga.
Client: KKLW (Shorefield Sdn Bhd)
Duration: 15.07.2010 to 30.11.2010
Extension of Contract for Overhead Line Vegetation Clearing & Substation Compound Grass Cutting
MTC Paper No. 194/2010 First Extension of Contract for Overhead Line Vegetation Clearing & Substation Compound Grass Cutting In Asajaya.
Client: Sarawak Energy
Duration: 16.06.2010 to 15.06.2011
Extension of Contract for Overhead Vegetation Clearing & Substation grass Cutting
MTC 576/2009 First Extension of Contract for Overhead Vegetation Clearing & Substation grass Cutting In Serian & Siburan.
Client: Sarawak Energy
Duration: 01.03.2010 to 28.02.2011
Extension For Overhead Vegetation Clearing & Substations Grass Cutting
MTC Paper No. 575/2009 First Extension of Contract For Overhead Vegetation Clearing & Substations Grass Cutting In Lundu.
Client: Sarawak Energy
Duration: 01.03.2010 to 28.02.2011
Electrical Works
SUB/RE45-09/BET/N23/Z456/124 Electrical Works at kpg Triso, Meludam
Client: KKLW (Shorefield Sdn Bhd)
Duration: 04.01.2010 to 25.06.2010
Electrical Works
SUB/RE45-09/ASJ/N20/Z456/68 Electrical Works at Kpg Tanjong Kelaso & Kpg Rangkang.
Client: KKLW (Shorefield Sdn Bhd)
Duration: 04.01.2010 to 31.01.2010
Electrical Works
SUB/RE45-09/ASJ/N20/Z456/66 Electrical Works at Kpg Jemukan Hulu, Kpg Sadong Jaya Laut, Kpg Sadong Jaya Ulu & Simpang 4 Sadong Jaya/ Sg. Bulu.
Client: KKLW (Shorefield Sdn Bhd)
Duration: 04.01.2010 to 31.08.2010
Electrical Works
SUB/RE45-09/ASJ/N20/Z456/63 Electrical Works at Kpg Jaie, Sadong Jaya
Client: KKLW (Shorefield Sdn Bhd)
Duration: 04.01.2010 to 31.08.2010
Electrical Works
SUB/RE45-09/SAM/N15/Z456/55 Electrical Works at Kpg Pinang, Samarahan
Client: KKLW (Shorefield Sdn Bhd)
Duration: 04.01.2010 to 30.06.2010
Electrical Works
SUB/RE45-09/SAM/N14/Z456/54 Electrical Works at Kpg Tg. Parang, Samarahan
Client: KKLW (Shorefield Sdn Bhd)
Duration: 04.01.2010 to 31.06.2010
Electrical Works
SUB/RE45-09/SMJ/N20/Z456/69 Electrical Works at Kpg Ensengei Iban & Ensengei Melayu.
Client: KKLW (Shorefield Sdn Bhd)
Duration: 10.11.2009 to 31.05.2010
Electrical Works
SUB/RE45-09/BET/N24/Z456/127 Electrical Works at Kpg Undai, Pusa
Client: KKLW (Shorefield Sdn Bhd)
Duration: 14.10.2009 to 11.06.2010
Electrical Works
SUB/RE45-09/BET/N24/Z456/126 Electrical Works at Kpg Semarang
Client: KKLW (Shorefield Sdn Bhd)
Duration: 14.10.2009 to 18.06.2010
Electrical Works
SUB/RE45-09/BET/N24/Z456/125 Electrical Works at Kpg Beladin
Client: KKLW (Shorefield Sdn Bhd)
Duration: 14.10.2009 to 25.06.2010
Underground/ Aerial Cable Jointing
Tender for Underground/ Aerial Cable Jointing in Kuching Region. (WR 46/05) ( SESCO KUCHING).
Client: Sarawak Energy
Duration: 01.05.2009 to 30.04.2007
Overhead Line Vegetation Clearing and Substation
Contract For Overhead Line Vegetation Clearing and Substation Grass Cutting in Lundu. (WR 40/08)
Client: Sarawak Energy
Duration: 01.03.2009 to 28.02.2010
Overhead Line Vegetation Clearing and Substation
Contract For Overhead Line Vegetation Clearing and Substation Compound Grass Cutting In Serian and Siburan, Western Region. (WR 45/2008)
Client: Sarawak Energy
Duration: 01.03.2009 to 28.02.2010
Cadangan Menaiktaraf Kerja Electrik
Cadangan Menaiktaraf Kerja Electrik dan Lampu Jalan Di Masjid Jamek, Kuching Sarawak. ( Tender No.: LAKMNS/MJ/34J)
Client: Baitulmal Sarawak
Duration: 23.10.2008 to 22.12.2008
Overhead Line Vegetation Clearing and Substation Grass Cutting
Contract For Overhead Line Vegetation Clearing and Substation Grass Cutting in Simunjan and Sebuyau. (MTC No: 191 A/2008)
Client: Sarawak Energy
Duration: Sarawak Energy
33kv Underground Cable Laying and Jointing Works
Contract For 33kv Underground Cable Laying and Jointing Works From Alan To Town Sub, Sibu. (MTC Paper No. 351/2007)
Client: Sarawak Energy
Duration: 10.03.2008 to 09.06.2009
Extension For The Installation of OH Lines & Aerial Cable
1st Extension Tender For The Installation of OH Lines & Aerial Cable Cum HT/LT pole Top Maintenance In Limbang Station.
Client: Sarawak Energy
Duration: 01.01.2008 to 31.12.2008
Extension Of Contract For 33kv & 11kv Substation
2nd Extension Of Contract For 33kv & 11kv Substation routine Maintenance In Sarikei Region
Client: Sarawak Energy
Duration: 29.12.2007 to 28.12.2008
Pemohon- Pemohon
Pemohon- Pemohon Di Kampung Sebandi Ulu & Sebandi Matang (Cina) & Kampung Subi, Asajaya. (RE87-06/ASJ/N14/S27)
Client: Shorefield Sdn Bhd
Duration: 11.11.2007